The bigger picture

Power cuts in M11

Manchester, Tameside · 1 April 2026 to 31 March 2027

Area figures count periods without power across the district’s postcode sectors. They are not the number of cuts every household experienced, and they only cover cuts recorded since PowerLogs began. They are refreshed every hour; last updated 22:07.

Power cuts by month

2026/27

Unplanned power cuts only. Months still to come are left empty.

18power cuts recorded

Across M11’s postcode sectors

12lasting 3 hours or more

The length that counts towards repeat-cut compensation

6d 7hlongest power cut

Approximate where the end time is a window

A closer look at each sector

Full postcodes stay off public pages
Postcode sectorPower cuts3 hours or moreLongest
M11 16522h 59m
M11 2746d 7h
M11 33240h 40m
M11 43146h 00m

One incident can cover several sectors, so sector figures do not add up to the district total. Sources and limits

See the record for your postcode

Area figures tell the story. Your postcode record adds the detail.

Check your postcode